Okay so day 1-33 are on the “tea?” page so I thought, seeing as I have so many more images to upload I would continue onto a different page. I also thought relevant that the page be names “or coffee?”

At the bottom of the “tea?” page we ended on day 33 with an image of me my dad and my nan, the frame was up, the window frames were in and the roof was covered with the waterproofing membrane. So we’re starting off with

Day 34 – Tuesday 12th October 2010

Here is the first board going up!

Bob the Builder sawing the wood to fit..

this wall is going up so quick

By the way… I was helping dad cut, fit and hold up the boards in between photographs, just so you know

One more bit to fit across the top and 2 walls are completed

Look I even made a little set of steps.. god they were heavy!

Second side is up :)

seeee…

Starting to come together

Right heres what I mean about helping dad….
BEFORE!

AFTER…

who’s that crazy looking fella?? oh it’s you dad “hello” *waves*

we did finish all 4 sides including the door frame… but it got too dark so I had to take the photos the next day, and here they are

Day 35 – Wednesday 13th October 2010

see look, good aye??

I know I know the door isn’t on yet… but thats like one of the last things to be fitted :)

Already getting the middle wall up to seperate dads work space from mine and mums

and theres our bit

Day 36 – Thursday 14th October 2010 (my lil sisters 18th :) )

Hi mum

It’s a bit of a family affair today, Dad’s working as am I helping mum cut all the insulation, Pops is also working on the insulation and my Uncle the “Sparky” also turned up today so it’s all hands on.

Smile Pops :D

Here’s what I did measured everything drew it out and let mum cut it haha.

there she is… in her boiler suit

Haha me and mum had to move outside to cut all the insulation for the ceiling

Have you ever seen “Dude wheres my Car?”

hehe, does this ring any bells “ZULTAN!”

mum got her head stuck in the ladder

look thats all my hard work in a line

and theres all the mess and offcuts which Pops has been fitting into all the small gaps

it’s getting dark in here

in this case its like father like daughter TAKE ONE

TAKE TWO

TAKE THREE

Meanwhile dad has been putting waterproofing all around the office.

Day 37 – Friday 15th October 2010

Mum went around the whole office and painted the blocks with maisonary paint.

This is my studio

Mum space

Dad’s office

Mum and pebbles having a brake :)

Floors’ down

Day 38 – Saturday 16th October 2010

The dwarf wall is in…

looks a bit messy out there… wheres the cleaner??

Glass is in the window frames now

Pretty water tight now.. except the doors not on so lets hope the rain doesnt go round corners.

Day 41 – Tuesday 19th October 2010

the tiles for the roof have arrived

and so has the wood for the cladding around the office

Day 43 – Thursday 21st October 2010

The roof is taking shape now.. I had to climb up a rickety ladder to get up here… so feel the fear haha

It looks alot longer than it is.

soo many leaves

I was too small to see any more so just lifted my camera high and clicked

Plasterboard arrived. About bloody time…

Day 45 – Saturday 23rd October 2010

It’s all coming together now… the ceiling is going up

It actually feels alot warmer inside now :)

Hey pebbs

Pebbles is a bit tired.. all that hard work aye?

it’s all happening so quickly this is my studio space :)

The plaster is going up and the office is all coming together now

Day 46 – Sunday 24th October 2010

Jamie’s on the roof

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Connecting to %s

Follow

Get every new post delivered to your Inbox.